University of Belgrade - Faculty of Agriculture
AgroSpace - Faculty of Agriculture Repository
    • English
    • Српски
    • Српски (Serbia)
  • English 
    • English
    • Serbian (Cyrillic)
    • Serbian (Latin)
  • Login
View Item 
  •   AgroSpace
  • Poljoprivredni fakultet
  • Radovi istraživača / Researchers’ publications
  • View Item
  •   AgroSpace
  • Poljoprivredni fakultet
  • Radovi istraživača / Researchers’ publications
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Contractor choice optimization in complex projects

No Thumbnail
Authors
Vuleta, J.
Andzić, S.
Novaković, Saša
Krstić, S.
Subić, Jonel
Article (Published version)
Metadata
Show full item record
Abstract
One of the most important problems that arise in the realization of any project and especially complex projects is contractor choice optimization of all its activities. The term choice optimization presumes the selection of such contractors that will perform their activities, and thus the whole project, on schedule and at minimum cost. This paper analyzes these problems in detail and shows how they can be presented using models of combinatorial parametric optimization. Since the majority of algorithms for resolving these models is inconvenient for practical application, this paper recommends a modified PERT-COST algorithm for cost minimization of project realization based on its lead time.
Keywords:
Algorhitm / Combinatorial optimization / Network model / Optimal solution / Optimization
Source:
Metalurgia International, 2013, 18, 10, 66-68

ISSN: 1582-2214

Scopus: 2-s2.0-84887046503
[ Google Scholar ]
Handle
https://hdl.handle.net/21.15107/rcub_agrospace_3156
URI
http://aspace.agrif.bg.ac.rs/handle/123456789/3156
Collections
  • Radovi istraživača / Researchers’ publications
Institution/Community
Poljoprivredni fakultet
TY  - JOUR
AU  - Vuleta, J.
AU  - Andzić, S.
AU  - Novaković, Saša
AU  - Krstić, S.
AU  - Subić, Jonel
PY  - 2013
UR  - http://aspace.agrif.bg.ac.rs/handle/123456789/3156
AB  - One of the most important problems that arise in the realization of any project and especially complex projects is contractor choice optimization of all its activities. The term choice optimization presumes the selection of such contractors that will perform their activities, and thus the whole project, on schedule and at minimum cost. This paper analyzes these problems in detail and shows how they can be presented using models of combinatorial parametric optimization. Since the majority of algorithms for resolving these models is inconvenient for practical application, this paper recommends a modified PERT-COST algorithm for cost minimization of project realization based on its lead time.
T2  - Metalurgia International
T1  - Contractor choice optimization in complex projects
EP  - 68
IS  - 10
SP  - 66
VL  - 18
UR  - https://hdl.handle.net/21.15107/rcub_agrospace_3156
ER  - 
@article{
author = "Vuleta, J. and Andzić, S. and Novaković, Saša and Krstić, S. and Subić, Jonel",
year = "2013",
abstract = "One of the most important problems that arise in the realization of any project and especially complex projects is contractor choice optimization of all its activities. The term choice optimization presumes the selection of such contractors that will perform their activities, and thus the whole project, on schedule and at minimum cost. This paper analyzes these problems in detail and shows how they can be presented using models of combinatorial parametric optimization. Since the majority of algorithms for resolving these models is inconvenient for practical application, this paper recommends a modified PERT-COST algorithm for cost minimization of project realization based on its lead time.",
journal = "Metalurgia International",
title = "Contractor choice optimization in complex projects",
pages = "68-66",
number = "10",
volume = "18",
url = "https://hdl.handle.net/21.15107/rcub_agrospace_3156"
}
Vuleta, J., Andzić, S., Novaković, S., Krstić, S.,& Subić, J.. (2013). Contractor choice optimization in complex projects. in Metalurgia International, 18(10), 66-68.
https://hdl.handle.net/21.15107/rcub_agrospace_3156
Vuleta J, Andzić S, Novaković S, Krstić S, Subić J. Contractor choice optimization in complex projects. in Metalurgia International. 2013;18(10):66-68.
https://hdl.handle.net/21.15107/rcub_agrospace_3156 .
Vuleta, J., Andzić, S., Novaković, Saša, Krstić, S., Subić, Jonel, "Contractor choice optimization in complex projects" in Metalurgia International, 18, no. 10 (2013):66-68,
https://hdl.handle.net/21.15107/rcub_agrospace_3156 .

DSpace software copyright © 2002-2015  DuraSpace
About the AgroSpace Repository | Send Feedback

re3dataOpenAIRERCUB
 

 

All of DSpaceCommunitiesAuthorsTitlesSubjectsThis institutionAuthorsTitlesSubjects

Statistics

View Usage Statistics

DSpace software copyright © 2002-2015  DuraSpace
About the AgroSpace Repository | Send Feedback

re3dataOpenAIRERCUB